The Back Story
This owner sought alterations to a prefabbed house, renovation of it’s kitchen, and a master suite on the 3rd floor. A new large area deck in the rear was also desired. The Curtice Group provided the designs, and have now launch into construction.
Project Timeline
OctoberNovemberDecemberJanuary